Move Projects from RW7 to RW8


(Phillip Jones) #1

Just upgraded from RW7 to RW8 I had some projects saved in 7 how do I move those to 8?


(Robert Ziebol 🖖🏼) #2

Just open them in RapidWeaver 8 by either dragging and dropping on the RW 8 icon or open RW 8 and then opening the file. RapidWeaver will convert the file and save it as a .rw8 file, which means it will keep the RapidWeaver 7 file too, just in case there is issues with RW 8.


(Phillip Jones) #3

Thanks.


(system) #4

This topic was automatically closed 30 days after the last reply. New replies are no longer allowed.